Eos (1F7) L4-2.0L Turbo (CCTA) (2009)
1
Cross Panel
‹› Removing:
‹› After removing screws - 2 -, separate cross panel with workshop equipment.
2
Bolt
‹› Quantity: 10
‹› Tightening specification: 25 Nm
3
PUR Adhesive Sealant
‹› DH 009 100 03
‹› Bead diameter: width = 8 mm, height = 10 mm
‹› Pay attention to the minimum curing time: the minimum curing time for the cross panel with 1K adhesive DH 009 100 is 180 minutes.
Lock Carrier With Attachments
Lock Carrier with Attachments
Removing