volkswagen Workshop Repair Guides

Volkswagen Workshop Service and Repair Manuals

Routing Tensioning Bands|Page 8187 > < Routing Tensioning Bands|Page 8185
Page 1
background image

Convertible Top Cable: Description and Operation
Routing Tensioning Bands 4 and 5

Tensioned Headliner Tensioning Bands

Routing Tensioning Bands 4 and 5

‹› All screws are microencapsulated and must always be replaced.

‹› Bolt tightening specification 3.5 Nm

‹› Tensioning band 1. Refer to => [ Routing Tension Band 1 ] See: Routing Tension Band 1 and tensioning bands 2 and 3 => [ Routing Tensioning

Bands 2 and 3 ] See: Routing Tensioning Bands 2 and 3 are secured. 

-

Raise rear window frame and remove (VAS 6365). 

-

Close hydraulic pump bypass screw and close roof.

-

Carefully press tensioned headliner - 1 - and roof pillar trim - 7 - apart and secure double eye - 4 - on main hinge arm. Direction of double eye is
parallel to edge of outrigger. 

-

Secure tensioning band - 5 - on end eye -  6 - on outside of main hinge in upper threaded connection.

-

Pull tensioning band - 2 - between main hinge and water drain hose.

-

Secure the end eyes - 3 - in the lower threaded connection on the outside of the main hinge.

Routing Tensioning Bands|Page 8187 > < Routing Tensioning Bands|Page 8185