Eos (1F7) V6-3.2L (BUB) (2008)
Switch the ignition on.
-
Using a multimeter, check the Positive Crankcase Ventilation (PCV) Heating Element N79 electrical connector terminal 1 to Ground (GND) for
voltage.
Specified value: battery voltage.
Switch the ignition off.
If the specified value was not obtained:
-
Check the wiring from the Positive Crankcase Ventilation (PCV) Heating Element N79 electrical connector terminal 1 to the Power Supply Relay
(terminal 50) J682 socket 1/30 for a short circuit to Ground (GND), or an open circuit.
-
Check the electrical harness connector for damage, corrosion, lose or broken terminals.
-
If necessary, repair the wiring connection.
If no malfunctions are found in the wiring:
Checking Ground (GND)
-
Using a multimeter, check the Positive Crankcase Ventilation (PCV) Heating Element N79 electrical connector terminal 2 to Ground (GND) for
continuity.
If the specification was not obtained:
-
Check the wiring for a short circuit to each other, Battery (+), and Ground (GND).
-
Check the electrical harness connector for damage, corrosion, lose or broken terminals.
-
If necessary, repair the faulty wiring connection.
If no malfunction is detected in the wiring:
-
Replace the Positive Crankcase Ventilation (PCV) Heating Element N79.
Final procedures
After repair work, the following work steps must be performed in the following sequence:
1. Check the DTC memory.
2. If necessary, erase the DTC memory.
3. If the DTC memory was erased, generate readiness code. See: Computers and Control Systems/Testing and Inspection/Monitors, Trips, Drive
Cycles and Readiness Codes