GLI L4-2.0L Turbo (BPY) (2008)
-
Operate the (VAS 6213) several times, vacuum must build up.
No vacuum
-
Replace the double check valve.
-
Operate the (VAS 6213) several times, vacuum must build up.
No vacuum
-
Replace the double check valve.