New Beetle Convertible L5-2.5L (BPR) (2007)
-
Pull tubing out of C-pillar channel in - direction of arrow -.
-
If present, pull insert tubing - 2 - off water guide - 1 -.
-
Pull headliner - 2 - from convertible top fabric retaining frame - 1 - out in - direction of arrow -.