New Beetle Convertible L5-2.5L (BPR) (2007)
-
Engage selector lever cable - 1 - into clip - arrow - on transmission. Maintain a distance of at least 5 mm to ATF cooler when routing selector
lever cable.
-
Install air filter housing.
-
Engage locking cable at selector mechanism into locking lever => [ Locking Cable ] See: Shift Interlock/Shift Interlock Cable/Service and Repair.
-
Adjust locking cable => [ Locking Cable, Adjusting ] See: Shift Interlock/Shift Interlock Cable/Adjustments.
-
Ignition key removal lock, checking function => [ Ignition Key Removal Lock, Checking Function ] See: Shift Interlock/Testing and Inspection.
-
Install selector mechanism cover and circuit board => [ Selector Mechanism Cover and Circuit Board ] See: Selector Mechanism Cover and
Circuit Board.
-
Install center console.
-
Install selector lever handle => [ Selector Lever Handle ] See: Selector Lever Handle.
-
Connect battery Ground (GND) cable.
-
Adjust selector lever cable => [ Selector Lever Cable, Checking and Adjusting ] See: Shift Linkage/Shift Cable/Testing and Inspection.
-
Check shift mechanism => [ Selector Mechanism, Checking ] See: Testing and Inspection.
-
Code radio.
-
Initialize power windows, set clock.
Selector Mechanism Assembly Overview
Selector Mechanism Assembly Overview
Removing => [ Selector Mechanism ] See: Selector Mechanism.