–
| Loosen the fastening screws -arrows- from
the Generator (Alternator) -C-. |
–
| Remove the Generator (Alternator) -C-. |
Installation is performed in reverse sequence to the removal,
considering the following: |
–
| First, place Poly-V belt on the crankshaft pulley, and then
on the tensioning roller, as indicated on the belt run → Engine; Rep. gr.13. |
–
| Tighten the securing nuts and screws to the specified tightening
torque → Chapter. |
Note After finishing the procedure, start the engine and check the
belt motion. |
|
|
|