Air Injection Pump Relay: Testing and Inspection

Secondary Air Injection Pump Relay J299, Checking

Special tools, testers and auxiliary items required

-

Multimeter.

-

Wiring diagram.

Test requirements

-

Fuse SB29 OK.

-

Fuse SB51 OK.

-

The Power Supply Relay (terminal 30, B+) J317 fuse OK.

-

Battery voltage at least 12.5 V.

-

All electrical consumers switched off.

-

A/C switched off.

-

The ignition switched off.

Test procedure

-

Perform a preliminary check to verify the customers complaint.  See: Powertrain Management/Computers and Control Systems/Testing and
Inspection/Scan Tool Testing and Procedures/Preliminary Check

Start diagnosis

-

Remove the Secondary Air Injection (AIR) Pump Relay J299.

Checking voltage

-

Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay J299 socket 1/30 to Ground (GND).

Specified value: battery voltage.

If the specified value was not obtained:

-

Check the wiring connection from the Secondary Air Injection (AIR) Pump Relay J299 socket 1/30 to TV2 (terminal 30 Junction) for an open
circuit, a short circuit to each other, Battery (+), and Ground (GND).

-

Check the wiring connections for damage, corrosion, loose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If the specified value was obtained:

-

Switch the ignition on.

-

Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay J299 socket 3/85 to Ground (GND) for voltage.

Specified value: battery voltage.

-

Switch the ignition off.

If the specified value was not obtained:

-

Check the wiring connection from the Power Supply Relay (terminal 30, B+) J317 socket 87 to the Secondary Air Injection (AIR) Pump Relay
J299 socket 3/85 for an open circuit, a short circuit to each other, Battery (+), and Ground (GND).

-

Check the wiring connections for damage, corrosion, loose or broken terminals.

-

If necessary, repair the faulty wiring connection.

If the specified value was obtained.

Checking wiring

If the manufacturers test box is being used. Perform the following step.

-

Install the test box.

If the manufacturers test box is not being used. Perform the following step.

-

Remove the Engine Control Module (ECM) J623.

-

Using a Multimeter, check the Secondary Air Injection (AIR) Pump Relay J299 socket 4/86 to the Engine Control Module (ECM) J623 electrical
harness connector T121 terminal 46 for resistance.

Secondary Air Injection

Engine Control Module (ECM)

(AIR) Pump Relay J299

J623 electrical connector T94

Component Locations, Overview|Page 306 > < Component Locations, Overview|Page 304