Removing and installing B-pillar trim |
Note The removal and installation sequence is only for the left B-pillar trim. Removal and installation of the right B-pillar trim are similar. |
t
| The bonded trim cannot be removed without damage. |
t
| Heat up trim in area of bonding surface using hot air blower -V.A.G 1416- prior to removal. |
t
| Remove existing adhesive residue of adhesive tape using adhesive strip remover -VAS 6349-. |
t
| If a trim is removed and reattached, only use adhesive remover -D 002 000 10- to remove the adhesive residue. |
t
| Ensure that the adhesive surfaces are free of dust and grease. |
t
| The trim must be bonded in place immediately following cleaning. |
t
| Remove protective backing immediately before installation. |
t
| Working temperature is approx. 21°C. |
|
|
|