acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Automatic Climate Control|Page 7790 > < Automatic Climate Control|Page 7788
Page 4
background image

14. Adjust the heater valve cable of the heater valve side:

-

Set the air mix control motor at COOL position.

-

Turn the heater valve arm to shut and connect the end of the heater valve cable to the heater valve arm.

-

Gently slide the heater valve cable outer housing back from the end enough to take up any slack in the heater valve cable, but not enough to
make the other end move the arm on the air mix control motor. Then snap the clamp down over the heater valve cable housing.

15. Turn the blower on and make sure that there is no air leakage.
16. Charge the system.
17. Test system performance.

HEATER-EVAPORATOR UNIT OVERHAUL 

Automatic Climate Control|Page 7790 > < Automatic Climate Control|Page 7788