acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Subframe > < Front Strut / Shock Tower|Description|Page 9490
Page 7
background image

-

Plug weld the holes areas of the dashboard lower and Damper housing with a MIG welder.

9. Weld the wheelhouse upper panel and front pillar extension.

10. Finish the welded area. Use a hammer and dolly to even out the side bulkhead and front side frame flanges for close fit with the surface of the front

wheelhouse and damper housing.

11. Apply the sealer.

Apply sealer to the mating surfaces of the lower dashboard and front side frame, etc.

12. Apply the paint.

See Paint Repair section.

WARNING:
-

Ventilate when spraying paint. Most paint contains substances that are harmful if inhaled or swallowed. Read the paint label before
opening the paint container.

-

Avoid contact with skin. Wear an approved respirator, gloves, eye protection and appropriate clothing when painting.

-

Paint is flammable. Store it in a safe place, and keep it away from sparks, flames or cigarettes. 

13. Apply the undercoat.

Undercoat the front floor, etc, and apply anti-rust agent to the inside of the welding section of the front side frame, lower dashboard, and upper
member, etc.

14. Install the related parts.

Install in the reverse order in which they were removed.

15. Inspect, check and make adjustment.

-

Adjust the headlight aim.Measure the front wheel alignment.

-

Inspect the brake system.

-

Adjust the headlight aim.

Subframe > < Front Strut / Shock Tower|Description|Page 9490