TSX L4-2.4L (2005)
16. Install the side engine mount bracket.
17. Install the upper bracket (A), then tighten the bolt/nuts in the numbered sequence shown.
18. Install the ground cable (B).
19. Install the variable valve timing control (VTC) oil control solenoid valve.
20. Connect the crankshaft position (CKP) sensor connector (A) and VTC oil control solenoid valve connector (B).
21. Install the crankshaft pulley.
22. Install the cylinder head cover.
23. Install the drive belt.
24. Install the splash shield.
25. Do the CKP pattern clear/CKP learn procedure.