acura Workshop Repair Guides

Acura (Honda) Workshop Service and Repair Manuals

Shift Solenoid Valve A and B Test|Page 2875 > < Shift Solenoid Valve A and B Test
Page 2
background image

14. Connect a jumper wire from the negative battery terminal to shift solenoid valve A or B connector terminal No. 1, and connect another jumper

wire from the positive battery terminal to connector terminal No. 2.

-

If a clicking sound is heard, repair the wire between the PCM connector terminal and the defective shift solenoid valve, then go to step 15.

-

If no clicking sound is heard, replace the secondary valve body, then go to step 15.

15. Install the secondary valve body  See: Service and Repair/Overhaul/Valve Body/Secondary Valve Body Replacement.

16. Install the starter  See: Service and Repair/Removal and Replacement/Automatic Transmission Installation.

17. Install the ATF dipstick.

18. Install the battery base  See: Service and Repair/Removal and Replacement/Automatic Transmission Installation.

19. Install the auxiliary under-hood fuse/relay box  See: Service and Repair/Removal and Replacement/Automatic Transmission Installation.

20. Install the battery heat shield  See: Service and Repair/Removal and Replacement/Automatic Transmission Installation.

21. Install the intake air duct  See: Service and Repair/Removal and Replacement/Automatic Transmission Installation.

22. Install the air cleaner  See: Engine, Cooling and Exhaust/Engine/Tune-up and Engine Performance Checks/Air Cleaner Housing/Service and

Repair.

23. Do the battery installation procedure  See: Starting and Charging/Battery/Service and Repair/Removal and Replacement.

Shift Solenoid Valve A and B Test|Page 2875 > < Shift Solenoid Valve A and B Test