Checking and tensioning
- Make
- Alfa Romeo
- Model
- 155 Factory Service Manual
- Year
- 1992–1998
- Section
- Power steering pump drive belt › Checking and tensioning
Vehicle characteristics and maintenanceChecking and tensioning
Checking and tensioning
- Unscrew the air filter screws and tip it over without disconnecting the latter from the sleeves.
- Proceed as indicated in the figure, measure the tension of the belt using tool N° 1.824.018.000 (C.2.0131).
- Check that the tensioning values, measured using a suitable tool, fall within the prescribed limits.
| Belt tension "POLY-VK5" power steering pump | |
| On installation | 400 ÷ 450 N |
| Re-tensioning | 300 ÷ 35c N |
NOTA: The belt can be re-tensioned after a short running in period, operating as follows: - bring the engine to a normal operating temperature; - turn the engine over for approx.10 minutes; - turn off the engine and wait for it to cool; - re-tension the belt to the prescribed value.
- If incorrect tension values are found, proceed as follows:
- Loosen the power steering pump screws.
- Acting on the micrometric tensioner, reset the correct belt tensioning.
- Tighten the power steering pump tightening screws.
Parts & tools for this job For 1992 Alfa Romeo 155
- TOOLTie rod end toolSearch: tie rod end puller
- TOOLBall joint separatorSearch: ball joint separator
- FLUIDPower steering fluidSearch: Alfa Romeo power steering fluid
Links open Amazon search results in a new tab. As an Amazon Associate I earn from qualifying purchases.