90 Quattro 20V (Canada) L5-2309cc 2.3L DOHC (7A) (1989)
Air Plenum Cover
8. Fasten mounting bolts A.
9. Install outside temperature sensor B.
10. Install right side air intake cover.
A/C Refrigerant Lines To Evaporator
11. Install A/C refrigerant lines to evaporator, be sure there is no tension on lines during installation.
-
Torque lines to 16 Nm (11.8 ft lb)
Heater/Evaporator Connections
12. Install heater hoses A & B, be sure to remove caps/plugs in hoses.
-
A = return to water pump.
-
B = feed to cylinder head.
13. Install instrument panel.
14. Install center vent/control panel.
15. Recharge refrigerant system.
16. Install battery.
17. Fill engine coolant, run engine to operating temperature and check for leaks.