| Install in reverse order, paying attention to the following: |
| –
| When replacing an operating unit, Climatronic control unit -J255-, attention must be paid to the exact assignment → Electronic parts catalogue. |
| –
| Tighten the bolt -1- to 1.5 Nm. |
| After replacing/installing the operating unit, Climatronic control unit -J255-, always perform the following operations in the
„Guided fault-finding“ function → Vehicle diagnostic tester. |
| –
| Perform/check the encoding. |
| –
| Interrogate the event recorder (and eliminate the cause of any entries displayed). |
| –
| Perform final control diagnosis if applicable. |
|
|
|