Installation is carried out in the reverse order; note the following: |
–
| Connect breather pipes according to allocation: |
l
| Engine = breather pipe -1- to activated charcoal filter system solenoid valve I (pulsed) -N80-. |
l
| Tank = Breather pipe -2- to fuel tank. |
–
| Fit activated charcoal filter into retainer. |
–
| Press down activated charcoal filter until it engages with a clicking sound. |
|
|
|