Procedure
- Make
- Audi
- Model
- A3 Cabriolet Mk2
- Year
- 2008–2013
- Section
- Brake lines and brake hoses › Procedure
Brake systemProcedure
Procedure
Side panel already cut out.Separate original joint using spot weld breaker V.A.G 1731.
Separate remaining joint using drill VAS 5830.

- Inner B-pillar
Drill 7 mm ∅ holes for SG plug weld seam using drill VAS 5830.

Weld in inner B-pillar using shielded arc welding equipment 250A VAS 6045A: SG plug weld seam.
Weld in inner B-pillar using welding unit (inverter): RP spot weld seam.

Parts & tools for this job For 2008 Audi A3
- TOOLBrake bleeder kitSearch: one man brake bleeder kit
- FLUIDBrake fluidSearch: brake fluid
- TOOLBrake line flaring toolSearch: brake line flaring tool
As an Amazon Associate we earn from qualifying purchases.