audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Removing and installing coolant pipe > < Removing and installing coolant pump
Removing, installing and checking thermostat
Removing, installing and checking thermostat
Special tools and workshop equipment required
   
t  Hose clip pliers -V.A.G 1921-
  W00-0464
Removing
  Caution
Observe notes on procedure for disconnecting the battery → Rep. gr.27.
–  Disconnect earth wire at battery with ignition switched off.
–  Remove engine cover panel -arrows-.
–  Drain off coolant → Chapter.
  A10-1564
–  Detach coolant hoses -1- and -2-.
  A10-1327
–  Remove bolts -4- and detach connection -3-, O-ring -2- and thermostat -1-.
Installing
Installation is carried out in the reverse order; note the following:
  Note
Renew O-ring.
–  Clean and smoothen sealing surface for O-ring as required.
–  Insert thermostat.
l  Installation position: Cross-piece on thermostat should be vertical.
–  Coat new O-ring with coolant.
–  Connect battery. Procedures required → Rep. gr.27.
–  Fill cooling system → Anchor.
Tightening torque
  A19-0042
ComponentNm
Connection to cylinder block15

Checking thermostat
–  Heat up the removed thermostat in hot water.
   
Starts to openFully openOpening travel
approx. 87 °Capprox. 102 °C 1)at least 7 mm
l  1) Cannot be tested.

   

Removing and installing coolant pipe > < Removing and installing coolant pump