–
| Disconnect coolant hose going to heat exchanger at coolant pipe (top left). |
–
| Slacken securing bolt -arrow- of coolant pipe (left-side). |
–
| Pull coolant pipe (top left) to rear out of cylinder block. |
–
| Detach coolant pipe (top left). |
Installation is carried out in the reverse order; note the following: |
Note t
| Renew gaskets, O-rings and self-locking nuts. |
t
| Secure all hose connections with the correct type of hose clips (same as original equipment) → Parts catalogue. |
–
| Before installing, clean and smoothen sealing surface for O-ring. |
–
| Lubricate new O-ring with “G12+” and slide onto coolant pipe. |
–
| Push coolant pipe (top left) into bore on cylinder block. |
–
| Install exhaust gas recirculation cooler → Chapter. |
–
| Install mechanical exhaust gas recirculation valve → Chapter. |
–
| Install starter catalytic converter: vehicles with front-wheel drive → Chapter, vehicles with four-wheel drive → Chapter. |
–
| Install front exhaust pipe with main catalytic converter: vehicles with front-wheel drive → Chapter, vehicles with four-wheel drive → Chapter. |
|
|
|