audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Checking thermostat > < Removing and installing coolant pump
Removing, installing and checking thermostat
Removing, installing and checking thermostat
Special tools and workshop equipment required
   
t  Pin wrench -3212-
  W00-0462
t  Locking pin -T40011-
Removing
l  Lock carrier must be in service position → Chapter.
–  Drain off coolant → Chapter.
–  Remove poly V-belt → Chapter.
  W00-1089
–  Unscrew bolt -arrow- and remove tensioner for poly V-belt.
  A13-0508
–  Unbolt poly V-belt pulley at power steering pump -arrows-, using pin wrench -3212- as a counterhold.
  A13-0441
–  Remove covers for cylinder head cover (left and right) -arrows-.
–  Remove toothed belt cover (left and right).
–  Remove crankshaft pulley → Chapter.
  A15-0360
–  Release retainers -1- and -2- and unscrew bolts -4- and -5-.
  Note
Bolts -item 3- must not be slackened.
–  Take off bottom sections of toothed belt cover.
  Note
The toothed belt tensioner is oil-damped and can therefore only be compressed slowly by applying constant pressure.
  A13-0509
–  Turn toothed belt tensioning roller -1- clockwise in direction of -arrow- using an 8 mm Allen key until tensioning lever -2- compresses tensioner -3- far enough for the pressure piston to be locked with locking pin -T40011-.
–  Insert locking pin -T40011- and release toothed belt tensioning roller.
  A13-0426
–  Pull toothed belt forwards slightly on tensioning roller and right camshaft sprocket -arrows-, but do not pull off completely.
  Caution
Timing must be re-adjusted if toothed belt has slipped off tensioning roller → Anchor. Follow all instructions for removing and installing toothed belt → Chapter.
  A19-0137
–  Detach coolant hoses -1- and -5- from thermostat housing.
–  Unscrew bolts -2-, -3- and -4- and detach thermostat housing.
–  Remove O-ring and thermostat.
Installing
Installation is carried out in the reverse order; note the following:
  Note
Renew O-ring.
–  Before installing, clean and smoothen sealing surface for O-ring.
–  Install thermostat.
  A19-0332
l  Installation position: vent valve -arrow- faces upwards and seal faces to housing.
–  Install thermostat housing.
  Caution
Timing must be re-adjusted if toothed belt has slipped off tensioning roller → Anchor. Follow all instructions for removing and installing toothed belt → Chapter.
  V19-0353
–  Using an 8 mm Allen key, turn toothed belt tensioning roller -1- clockwise in direction of -arrow- until the locking pin -T40011- can be removed.
–  Proceed as follows to pre-tension tensioning roller before first starting engine:
–  Apply torque wrench to hexagon socket on tensioning roller.
–  Tension belt by applying a torque of 15 Nm to the tensioning roller. This provides the correct amount of initial tension.
–  Install crankshaft pulley → Chapter.
–  Install poly V-belt → Anchor.
–  Install lock carrier → Chapter.
–  Fill cooling system → Anchor.
Tightening torque
  A13-0426
ComponentNm
Thermostat housing to cylinder block10

   

Checking thermostat > < Removing and installing coolant pump