No. | Operating sequence |
1 | ON signal |
| Auxiliary heating:l
| Signal from operating and display unit, Climatronic control unit -J255- (via data bus, setting is made on MMI). |
l
| Signal from auxiliary heating radio controlled receiver -R64-. |
l
| Signal from vehicle diagnostic, testing and information system -VAS 5051/- (by way of basic setting function). |
–
| Operating and display unit, Climatronic control unit -J255- interrogation (by way of data bus). |
|
| Supplementary heater (for vehicles with diesel engine without supplementary air heater element -Z35- only):l
| Signal from operating and display unit, Climatronic control unit -J255- (by way of data bus). |
l
| Signal from vehicle diagnostic, testing and information system -VAS 5051/- (by way of basic setting function). |
|
2 | Initiation of starting . |
| Auxiliary heating:l
| The operating and display unit, Climatronic control unit -J255- decides that heating mode is required to attain the specified temperature in the passenger compartment. |
–
| Checking of measured values and components by way of interrogation of event recorder, power supply, coolant temperature and checking of all electrical components and input signals → Chapter. |
–
| Initiation of starting. |
|
| Supplementary heater (for vehicles with diesel engine without supplementary air heater element -Z35- only):–
| Checking of measured values and components by way of interrogation of event recorder, power supply, coolant temperature and checking of all electrical components and input signals → Chapter. |
–
| Initiation of starting. |
|
| Possible deviations, starting is not initiated. |
| Auxiliary heating:l
| The operating and display unit, Climatronic control unit -J255- decides that heating mode is not required to attain the specified temperature in the passenger compartment. |
–
| Auxiliary ventilation (summer mode) → Chapter. |
|
3 | Start |
| 3.1 | Starting (diesel) |
| | l
| No deviations in measured values and components monitored → Chapter. |
|
| | –
| Actuation of circulation pump -V55- and heater coolant shut-off valve -N279-. |
–
| Voltage at combustion air blower -V6- for brief period. |
–
| Voltage at glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 8 V | 5 sec. |
| | Metering pump -V54- (regulated). | 0 Hz | - |
| | Glow plug for heater -Q9-. | 8 V | 35 sec. |
| | –
| Activation of combustion air blower -V6- (supply). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 8 V | 7 sec. |
| | Metering pump -V54- (regulated). | 0 Hz | - |
| | Glow plug for heater -Q9-. | 8 V | 7 sec. |
| | –
| Reduction in voltage at combustion air blower -V6-. |
–
| Activation of metering pump -V54- (fuel pre-supply, regulated, start-up sequence). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 6 to 4 V | 26 sec. |
| | Metering pump -V54- (regulated). | approx. 4 Hz | 26 sec. |
| | Glow plug for heater -Q9-. | approx. 8 V | 26 sec. |
| | –
| Increase in voltage at combustion air blower -V6- (monitoring time). |
–
| Slight increase in regulation at metering pump -V54- (fuel pre-supply, regulated). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 4 to 9 V | 37 sec. |
| | Metering pump -V54- (regulated). | 4 to 5 Hz | 37 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | 8 V | 37 sec. |
| | –
| Slight increase in voltage at combustion air blower -V6- to full load. |
–
| Increase in clock frequency of metering pump -V54- to full load. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 9 V | 15 sec. |
| | Metering pump -V54- (regulated). | 5 to 8 Hz | 15 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | 8 V | 15 sec. |
| | –
| Combustion air blower -V6- set to full load. |
–
| Clock frequency of metering pump -V54- set to full load. |
–
| Deactivation of glow plug for heater -Q9- (start of full load mode). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 9 V | approx. 45 sec. |
| | Metering pump -V54- (regulated). | approx. 6 Hz | approx. 45 sec. |
| | Glow plug for heater -Q9- (flame monitoring). | 0 V | - |
| | |
| 3.2 | Starting (petrol) |
| | l
| No deviations in measured values and components monitored → Chapter. |
|
| | –
| Signal for actuation of circulation pump -V55- and heater coolant shut-off valve -N279-. |
–
| Voltage at combustion air blower -V6- for brief period. |
–
| Voltage at glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 8 V | 5 sec. |
| | Metering pump -V54- (regulated). | 0 Hz | - |
| | Glow plug for heater -Q9- (pre-heating, regulated). | approx. 8 V | 5 sec. |
| | –
| Increasing voltage at combustion air blower -V6- (supply). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 0 to 2 V | 40 sec. |
| | Metering pump -V54- (regulated). | 0 Hz | - |
| | Glow plug for heater -Q9- (pre-heating, regulated). | approx. 8 V | 40 sec. |
| | –
| Brief activation of metering pump -V54-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 2 V | 5 sec. |
| | Metering pump -V54- (regulated). | approx. 4 Hz | 5 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | approx. 8 V | 5 sec. |
| | –
| Increasing voltage at combustion air blower -V6-. |
–
| Increase in clock frequency of metering pump -V54- to full load. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 2 to 4 V | 18 sec. |
| | Metering pump -V54- (regulated). | 2 to 3 Hz | 18 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | approx. 8 V | 18 sec. |
| | –
| Increase in voltage at combustion air blower -V6-. |
–
| Increase in clock frequency of metering pump -V54- (start-up sequence). |
–
| Reduction of voltage at glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 4 to 8 V | 17 sec. |
| | Metering pump -V54- (regulated). | 3 to 6 Hz | 17 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | approx. 8 V | 17 sec. |
| | –
| Increase in clock frequency of metering pump -V54-. |
–
| Deactivation of glow plug for heater -Q9-. |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | 8 V | 20 sec. |
| | Metering pump -V54- (regulated). | 6 to 7 Hz | 20 sec. |
| | Glow plug for heater -Q9-. | 0 V | - |
| | –
| Slight increase in voltage at combustion air blower -V6- to full load. (monitoring time) |
–
| Increase in clock frequency of metering pump -V54- to full load (start of full load mode). |
|
| | Components | Actuation with | Duration approx. |
| | Combustion air blower -V6- (regulated). | approx. 9 V | approx. 45 sec. |
| | Metering pump -V54- (regulated). | 7 to 8 Hz | approx. 45 sec. |
| | Glow plug for heater -Q9- (pre-heating, regulated). | 0 V | - |
| | |
3.3 | Possible deviations, starting is not initiated. |
| l
| Deviation in measured values and components monitored. By interrogation of event recorder, power supply, coolant temperature and checking of all electrical components and input signals → Chapter. |
–
| Termination of starting. |
|
| l
| Resistance of flame monitor -G64- outside specified range → Chapter. |
–
| Termination of process (1 x start repetition). |
|
| l
| Resistance of glow plug for heater -Q9- outside specified range even after start repetition. Interrogation of resistance of glow plug for heater -Q9- (remains hot) → Chapter. |
–
| Termination of procedure (entry in event recorder)/fault/off. |
|