Removing and installing expansion valve
- Make
- Audi
- Model
- A5 Cabriolet
- Year
- 2009–2017
- Section
- Refrigerant circuit › Removing and installing expansion valve
Removing and installing expansion valve
Note
- After the air conditioner compressor is switched off, it might take a relatively long period on this vehicle before the pressure in the high-pressure side drops (the expansion valve is cold and the pressure in the low-pressure side increases rapidly after the compressor is switched off, the expansion valve is closed and the refrigerant can flow to the low-pressure side only slowly). If the air conditioner compressor is switched on, the pressure in the low-pressure side drops, the expansion valve is opened and the refrigerant can flow to the low-pressure side.
- From the start of production up to the conversion from model year 2012 onwards, evaporators with a width (block depth) (A) of approx. 40 mm were fitted (air conditioning unit with part number “8K_ 820 005”). From model year 2012 onwards and depending on the vehicle version, evaporators with a width (block depth) (A) of approx. 50 mm are being introduced gradually (air conditioning unit with part number “8T_ 820 005”). Pay attention to the correct assignment of the expansion valve to the evaporator (different versions) Electronic parts catalogue.

- The different versions of the air conditioning unit can be distinguished from the outside by the part number (B) on the label (A)Electronic parts catalogue.

- The part number (B) on the label (A) can be read e.g. when the CD changer is removed (depending on vehicle equipment) CommunicationRep. gr.91DVD/CD changer; Removing and installing CD changer.
Switch off ignition.
Discharge refrigerant circuit Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station).
Note
- Depending on the position of the service connection at the refrigerant line and the vehicle version, it may be necessary to remove the additional reinforcement for the body brace (left-side) to make it possible to connect the service coupling of the air conditioner service station (e.g. on the Audi Q5) Running gear, axles, steeringRep. gr.40Suspension strut, upper links; Exploded view - suspension strut, upper links and Air conditioner with refrigerant R134aRep. gr.87General notes on air conditioning systems.
For all work on vehicles with a high-voltage system, note the additional warning instructions for working on such vehicles → Chapter and Electrical systemRep. gr.93General warning instructions for work on the high-voltage system.
For the following steps, work in the vicinity of high-voltage system components is necessary. Therefore, perform a visual inspection of the high-voltage components and wiring to check for damage → Chapter and note Electrical systemRep. gr.93General warning instructions for work on the high-voltage system.
Warning Safety hazard: the engine can start unexpectedly.
Before carrying out general work on a vehicle with high-voltage electrical system, switch off the ignition and remove the ignition key from the vehicle.
Warning Working on vehicles with high-voltage wiring:
Do not support yourself or tools on high-voltage wiring or associated components --> this can damage the insulation. High-voltage wiring must not be excessively bent or kinked --> this can damage the insulation. The round high-voltage connectors are colour-coded with an external coloured ring and are provided with mechanical coding or guide lugs. It is important to observe this coding when joining up the round high-voltage connectors, otherwise the connectors can be damaged.
Warning DANGER!Risk of fatal injury if high-voltage components are damaged.
Observe the following when working in the vicinity of high-voltage components or wiring:
- It is not permitted to use cutting or forming tools, other sharp-edged tools or heat sources such as welding, brazing, soldering, hot air or thermal bonding equipment.
- Before starting work, visually inspect the high-voltage components in the areas involved.
- Before working in the engine compartment, visually inspect the power and control electronics for electric drive JX1, electric drive motor V141, air conditioner compressor V470 and high-voltage wiring.
- Before working on the vehicle underbody, visually inspect the high-voltage wiring and covers.
- Before working on the rear section of the vehicle, visually inspect the high-voltage wiring and the electro-box with the maintenance connector for high-voltage system TW .
- Visually inspect all potential equalisation lines.
- There must be no external damage on any component.
- The insulation of the high-voltage wiring and potential equalisation lines must not be damaged.
- There must be no unusual deformation of the high-voltage wiring.
- All high-voltage components must be identified by a red warning sticker.
As work on the high-voltage system is required for the following sequence of operations, de-energise the high-voltage system → Chapter, Electrical systemRep. gr.93De-energising high-voltage system. Pay particular attention to the “General warning instructions for work on the high-voltage system”Electrical systemRep. gr.93General warning instructions for work on the high-voltage system.
De-energise high-voltage system Electrical systemRep. gr.93De-energising high-voltage system.
Detach earth connection from battery AElectrical systemRep. gr.27Battery; Disconnecting and connecting battery.
Remove refrigerant line with internal heat exchanger → Chapter.
Note
- Should it be necessary in order to be able to remove and install the expansion valve, remove the cowl panel trim (C)General body repairs, exteriorRep. gr.50Bulkhead; Removing and installing plenum chamber cover.
Detach earth connection from battery AElectrical systemRep. gr.27Battery; Disconnecting and connecting battery.
Remove plenum chamber cover and/or cowl panel trim (different versions) General body repairs, exteriorRep. gr.50Bulkhead; Removing and installing plenum chamber cover.
Vehicles with 6-cyl. TDI engine:
Remove refrigerant line with internal heat exchanger → Chapter.
All models except vehicles with 6-cyl. TDI engine:
Unfasten refrigerant line with internal heat exchanger from expansion valve and vehicle and move to one side (do not remove) → Chapter.
Note
- On vehicles with a 6-cyl. TDI engine, there is not enough space to move the refrigerant line to the side due to the shape of the plenum chamber partition panel.
- On vehicles with a petrol engine or 4-cyl. TDI engine, the plenum chamber partition panel does not have to be unfastened or removed from the vehicle (there is sufficient space).
- When unfastening the plenum chamber partition panel, pay attention to the vacuum line to the brake servo to avoid damaging it.
Remove bolts (A).

Detach expansion valve (B) from refrigerant lines to evaporator.
Note
- Seal open pipes and connections at evaporator with suitable caps (to prevent ingress of dirt and moisture).

Install in reverse order of removal; note the following:
Clean connecting pipes (C) and (E) to evaporator as well as connections at expansion valve and check for damage.
Note
- There are different versions of the expansion valve (identical housing but different characteristic control curve); therefore it is important to observe the correct assignment Electronic parts catalogue.
- Observe fitting instructions for O-rings → Chapter.
Renew O-rings (B) and (F); for correct version refer to Electronic parts catalogue.
Lubricate O-rings lightly with refrigerant oil before installing → Chapter.
Pay attention to correct positioning of retaining plate (D) on connecting pipes (C) and (E) to evaporator.
Tighten bolts (G).
Tightening torque: 10 NmInstall refrigerant line with internal heat exchanger → Chapter.
Evacuate and charge refrigerant circuit Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit (Air conditioner with refrigerant R134a; Refrigerant circuit; Working with the air conditioner service station).
After completing the work and before installing the plenum chamber cover (B), visually inspect the high-voltage components (D) and the high-voltage wires (E)Electrical systemRep. gr.93General warning instructions for work on the high-voltage system.

For electrical connections and routing, refer to Current flow diagrams, Electrical fault finding and Fitting locations.
Re-energise power supply of high-voltage system Electrical systemRep. gr.93De-energising high-voltage system.
Re-install remaining components (removed earlier).
Switch on ignition.
Interrogate event memory of operating and display unit (Climatronic control unit J255) and erase any faults displayed Vehicle diagnostic, testing and information system VAS 5051 ("Guided Fault Finding").
Start up air conditioner after charging refrigerant circuit → Chapter.
Note
- Also observe notes on starting up air conditioner after charging Air conditioner with refrigerant R134aRep. gr.87General notes on air conditioning systems (before using air conditioner after system has been re-charged).
Parts & tools for this job For 2009 Audi A5
- PARTEngine gasket setSearch: Audi A5 2009 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.