Installing cylinder head
- Make
- Audi
- Model
- A7 Sportback
- Year
- 2010–2018
- Section
- Cylinder head › Installing cylinder head
Installing cylinder head
Warning Risk of damage to sealing surfaces.
- Carefully remove sealant residue from cylinder head and cylinder block.
- Ensure that no long scores or scratches are made on the surfaces.
- No oil or coolant must be allowed to remain in the blind holes for the cylinder head bolts in the cylinder block.
- Carefully remove any sealant residue from the cylinder head and cylinder block. Ensure that no long scores or scratches are made on the surfaces.
- Carefully remove any remaining emery and abrasive material.
- Do not remove new cylinder head gasket from packaging until it is ready to be fitted.
- Handle the cylinder head gasket very carefully to prevent damage to the silicone coating or the indented area of the gasket.
- When installing an exchange cylinder head, the plastic protectors fitted to protect the open valves should not be removed until the cylinder head is ready to be fitted.
- Turn the engine carefully at least 2 rotations to ensure that none of the valves make contact when the starter is operated.
Note
- Renew bolts tightened with specified tightening angle.
- Renew self-locking nuts, seals, gaskets and O-rings after removal.
- Note the different sealants for sealing surfaces and cylinder head bolts Electronic parts catalogue.
- When installing an exchange cylinder head, the contact surfaces between the hydraulic compensation elements, roller rocker fingers and cams must be oiled before installing the cylinder head cover.
- After renewing the cylinder head or cylinder head gasket, change the coolant and engine oil.




Fit new seals for coolant pipe (front).

Place cylinder head gasket in position.
Installation position: the word “oben” (top) or the Part No. should be visible.Pay attention to dowel sleeves (arrows) in cylinder block.Fit cylinder head.
Tighten cylinder head bolts → Fig..
Tighten bolts (arrows).

Note
- Cylinder head bolts do not have to be torqued down again later after repair work.
Remaining installation steps are carried out in reverse sequence; note the following:
Install camshafts → Chapter.
Install coolant pipe (front left) → Chapter.
Install fuel line for MPI injection system → Chapter.
Install coolant pipe (top) → Chapter.
Install coolant pipe (front right) → Chapter.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Change engine oil MaintenanceBooklet411.
Fill cooling system with fresh coolant → Chapter.
- Fig.“Cylinder head - tightening torque and sequence”
- Fig.“Guide tube for oil dipstick - tightening torque”
- Item
Parts & tools for this job For 2010 Audi A7
- PARTEngine gasket setSearch: Audi A7 2010 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.