Workshop Manuals Factory service & repair Audi
01 Servicing 6-cylinder TDI engine, common rail (EA 897 Gen. I)02 4-cylinder TDI engine (2.0 ltr. 4-valve common rail - generation II)03 Direct petrol injection and ignition system (4-cyl. 2.0 ltr. 4-valve turbo with timing chain)04 8-cylinder direct injection engine (4.0 ltr. 4-valve TFSI)05 4-cylinder TDI engine, 2.0 ltr. 4-valve common rail (EA 288 Gen. I)06 6-cylinder direct injection engine (evo) with supercharger (3.0 ltr. 4-valve TFSI)07 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)08 6-cylinder direct injection engine with supercharger (3.0 ltr. 4-valve TFSI)09 Fuel supply system, petrol engines10 6-cylinder direct injection engine (2.5 ltr., 2.8 ltr. 4-valve)11 6-cylinder TDI engine (3.0 ltr. 4-valve common rail)12 Fuel supply system, diesel engines13 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation II)14 6-cylinder TDI engine, 3.0 ltr. 4-valve common rail (EA 897 Gen. I)15 Rear final drive 0BC, 0BD, 0BE, 0BF16 Gearbox: Servicing multitronic 0AW17 Servicing 7-speed dual clutch gearbox 0B5 (S tronic)18 Servicing 7-speed dual clutch gearbox 0CJ, 0CL, 0CK19 7-speed dual clutch gearbox 0CK20 7-speed dual clutch gearbox 0B5 (S tronic)21 Gearbox: multitronic 0AW, front-wheel drive22 8-speed automatic gearbox 0BK, four-wheel drive23 8-speed automatic gearbox 0BW hybrid, front-wheel drive24 Running gear: Trailer Operation Guide25 Running gear: Wheel/Tyre Guide26 Running gear, front-wheel drive and four-wheel drive27 Brake system28 Heating, air conditioning29 Heating and air conditioning: Auxiliary/supplementary heater30 Electrical system31 Electrical: Communication32 General body repairs, interior33 General body repairs, exterior
Audi A7 Sportback (2010-2018)30 · Electrical system
30 · Electrical

Removing and installing battery

Make
Audi
Model
A7 Sportback
Year
2010–2018
Section
Battery › Removing and installing battery
Electrical systemRemoving and installing battery

Removing and installing battery

Electrical system; General information

Note

  • If renewing battery, connect battery charger to provide back-up power supply Electrical system; General informationRep. gr.27Charging battery.

Removing

A27-10281

Switch off ignition.

Lift luggage compartment floor using handle and fold forward.

If fitted, remove accumulator and move to one side (with connections attached) Running gear, axles, steeringRep. gr.43Air suspension; Removing and installing accumulator.

Take out vehicle tool kit.

Remove bolts (arrows) and detach retainer (1).

Disengage cover (7) for negative battery terminal at battery (arrows).

A27-10249

Slacken off nut (4) several turns and disconnect battery clamp (5) of earth cable from negative battery terminal.

Pull off cover (1) over positive battery terminal.

Slacken off nut (2) several turns and disconnect battery clamp (3) of positive cable together with main fuse holder from positive battery terminal.

Pull off hose (6) for central gas venting system.

Remove bolt (8) on battery retainer plate (9).

Pull battery out of battery tray and lift out of luggage compartment.

Warning Observe environmental requirements.

  • When disposing of used batteries, always observe the required disposal procedures for batteries and sulphuric acid Electrical system; General informationRep. gr.27Battery.

Installing

Note

  • Only install maintenance-free batteries with the specifications “TL82506” (from December 1997 onwards) and “VW75073” (from August 2001 onwards).
  • Batteries from the Audi parts range feature a base strip adapter for matching to different retainer flanges. The battery operating instructions give details of when and how to use the base strip adapter.

Insert battery in battery tray so that battery base strip engages in retainer flanges of battery tray (arrow).

A27-10282
It should no longer be possible to move the battery.

Fit battery retainer plate (5).

A27-10267
Lug (arrow) on battery retainer plate must engage in recess in battery base strip (4).

Tighten bolt (6) for battery retainer plate.

Fit hose (3) for central gas venting system.

Connect up battery in the following sequence with ignition and electrical equipment switched off:

First connect battery clamp (2) of positive cable by hand to positive battery terminal “+” and tighten nut.

Close cover (1) over positive battery terminal.

Unplug electrical connector (2) at battery monitor control unit J367(item 3).

A27-10252

Attach battery clamp of earth cable to negative battery terminal “–” by hand and tighten nut (1).

Reconnect connector at battery monitor control unit J367.

Check that battery is firmly secured after installing.

Fit cover for negative battery terminal on battery.

A27-10281

Fit retainer (1) and tighten bolts (arrows).

After renewal, battery must be adapted using Vehicle diagnostic tester.

The following measures are required after re-connecting the battery:

  • Activate automatic open/close function of electric window regulators Owner's Manual for the vehicle.
  • Interrogate event memories of all control units and erase “Low voltage” entry vehicle diagnostic tester.

Note

  • After reconnecting the voltage supply, it is possible that the ESP warning lamp will not go out until the vehicle has been driven several metres.

Tightening torques

  • Chapter“Exploded view - battery”

Parts & tools for this job For 2010 Audi A7

As an Amazon Associate we earn from qualifying purchases.