Workshop Manuals Factory service & repair Audi
01 Servicing 6-cylinder TDI engine, common rail (EA 897 Gen. I)02 4-cylinder TDI engine (2.0 ltr. 4-valve common rail - generation II)03 Direct petrol injection and ignition system (4-cyl. 2.0 ltr. 4-valve turbo with timing chain)04 8-cylinder direct injection engine (4.0 ltr. 4-valve TFSI)05 4-cylinder TDI engine, 2.0 ltr. 4-valve common rail (EA 288 Gen. I)06 6-cylinder direct injection engine (evo) with supercharger (3.0 ltr. 4-valve TFSI)07 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation III)08 6-cylinder direct injection engine with supercharger (3.0 ltr. 4-valve TFSI)09 Fuel supply system, petrol engines10 6-cylinder direct injection engine (2.5 ltr., 2.8 ltr. 4-valve)11 6-cylinder TDI engine (3.0 ltr. 4-valve common rail)12 Fuel supply system, diesel engines13 4-cylinder direct injection engine (1.8, 2.0 ltr. 4-valve TFSI - generation II)14 6-cylinder TDI engine, 3.0 ltr. 4-valve common rail (EA 897 Gen. I)15 Rear final drive 0BC, 0BD, 0BE, 0BF16 Gearbox: Servicing multitronic 0AW17 Servicing 7-speed dual clutch gearbox 0B5 (S tronic)18 Servicing 7-speed dual clutch gearbox 0CJ, 0CL, 0CK19 7-speed dual clutch gearbox 0CK20 7-speed dual clutch gearbox 0B5 (S tronic)21 Gearbox: multitronic 0AW, front-wheel drive22 8-speed automatic gearbox 0BK, four-wheel drive23 8-speed automatic gearbox 0BW hybrid, front-wheel drive24 Running gear: Trailer Operation Guide25 Running gear: Wheel/Tyre Guide26 Running gear, front-wheel drive and four-wheel drive27 Brake system28 Heating, air conditioning29 Heating and air conditioning: Auxiliary/supplementary heater30 Electrical system31 Electrical: Communication32 General body repairs, interior33 General body repairs, exterior
Audi A7 Sportback (2010-2018)28 · Heating, air conditioning
28 · Heating & A/C

Removing and installing battery cooling module

Make
Audi
Model
A7 Sportback
Year
2010–2018
Section
Battery cooling module › Removing and installing battery cooling module
Heating, air conditioningRemoving and installing battery cooling module

Removing and installing battery cooling module

Electrical system, hybrid

For all work on vehicles with a high-voltage system, note the additional warning instructions for working on such vehicles → Chapter and Electrical system, hybrid Rep. gr.93General warning instructions for work on the high-voltage system.

For the following steps, work in the vicinity of high-voltage system components is necessary, perform “Visual inspection of the high-voltage components and wiring to check for damage”Chapter and note Electrical system, hybridRep. gr.93General warning instructions for work on the high-voltage system.

Warning Safety hazard: the engine can start unexpectedly.
Before carrying out general work on a vehicle with high-voltage electrical system, switch off the ignition and remove the ignition key from the vehicle.

Warning Working on vehicles with high-voltage wiring:
Do not support yourself or tools on high-voltage wiring or associated components --> this can damage the insulation. High-voltage wiring must not be excessively bent or kinked --> this can damage the insulation. The round high-voltage connectors are colour-coded with an external coloured ring and are provided with mechanical coding or guide lugs. It is important to observe this coding when joining up the round high-voltage connectors, otherwise the connectors can be damaged.

Warning DANGER!Risk of fatal injury if high-voltage components are damaged.
Observe the following when working in the vicinity of high-voltage components or wiring:

  • It is not permitted to use cutting or forming tools, other sharp-edged tools or heat sources such as welding, brazing, soldering, hot air or thermal bonding equipment.
  • Before starting work, visually inspect the high-voltage components in the areas involved.
  • Before working in the engine compartment, visually inspect the power and control electronics for electric drive JX1, electric drive motor V141, air conditioner compressor V470 and high-voltage wiring.
  • Before working on the vehicle underbody, visually inspect the high-voltage wiring and covers.
  • Before working on the rear section of the vehicle, visually inspect the high-voltage wiring and the electro-box with the maintenance connector for high-voltage system TW .
  • Visually inspect all potential equalisation lines.
Check the following when making the visual inspection:
  • There must be no external damage on any component.
  • The insulation of the high-voltage wiring and potential equalisation lines must not be damaged.
  • There must be no unusual deformation of the high-voltage wiring.
  • All high-voltage components must be identified by a red warning sticker.

Special tools and workshop equipment requiredEngine bung set VAS 6122

Removing

A87-11125

Switch off ignition.

Discharge refrigerant circuit Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit.

Remove air inlet duct for drive battery → Chapter.

Remove bolt (2) and disconnect refrigerant line (1).

Remove bolt (3) and disconnect refrigerant line (4).

Seal off open lines and connections with clean plugs from engine bung set VAS 6122.

Unplug and move clear electrical connectors (1, 2 and 3).

A87-11188

Unscrew nuts (arrows) and detach battery cooling module.

Installing

Tightening torques

  • Chapter“Exploded view - refrigerant lines, front refrigerant lines on vehicles with high-voltage system”

Install in reverse order of removal; note the following.

Note

  • Observe fitting instructions for O-rings → Chapter.
  • After attaching, check routing of refrigerant lines. They must be inserted in brackets provided and should not make contact with other components.
  • When installing, also pay attention to condensation drain of battery cooling module → Chapter.

Renew O-rings; for correct version, refer to Electronic parts catalogue.

A87-11043

Clean refrigerant line connections (3 and 5) and check for damage.

Make sure that O-rings (4) are correctly seated in grooves of corresponding mounting.

Check that dowel pin (2) (not fitted on all connections) is not damaged and is seated correctly.

Tighten bolts (1).

Install refrigerant lines to battery cooling module in luggage compartment → Chapter.

Re-install remaining components (removed earlier).

For electrical connections and routing, refer to Current flow diagrams, Electrical fault finding and Fitting locations.

Evacuate and charge refrigerant circuit Air conditioner with refrigerant R134aRep. gr.87Refrigerant circuit.

Switch on ignition.

Interrogate event memory of operating and display unit (Climatronic control unit J255) and erase any entries displayed Vehicle diagnostic tester in “Guided Fault Finding” mode.

Start up air conditioner after charging refrigerant circuit → Chapter.

Note

  • Also observe notes on starting up air conditioner after charging Air conditioner with refrigerant R134aRep. gr.87General notes on air conditioning systems.

Parts & tools for this job For 2010 Audi A7

As an Amazon Associate we earn from qualifying purchases.