Procedure
- Make
- Audi
- Model
- A8 D3
- Year
- 2002–2010
- Section
- Servicing motronic injection system › Procedure
‹ Prev Wiring and component check on engine control unit with test box V.A.G 1598/31Next › Removing and installing engine control unit
Motronic injection and ignition system (6-cyl.)Procedure
Procedure
Remove engine control unit → Chapter.
Connect test box V.A.G 1598/31 to wiring harness connectors.

Connect earth clip of test box to earth.
The instructions for performing the individual tests indicate whether or not the engine control unit itself also needs to be connected to the test box.
Carry out test as described in relevant repair procedures.
After completing test, re-install engine control unit → Chapter.
‹ Prev Wiring and component check on engine control unit with test box V.A.G 1598/31Next › Removing and installing engine control unit
Parts & tools for this job For 2002 Audi A8
- PARTSpark plugsSearch: Audi A8 2002 spark plugs
- TOOLSpark plug socketSearch: spark plug socket
- TOOLSpark plug gap toolSearch: spark plug gap tool
As an Amazon Associate we earn from qualifying purchases.