audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

Air Door, HVAC > < Accumulator HVAC|Description and Operation|Page 4936
Page 2
background image

-

Beginning model year 1999, an accumulator will be phased into production with a block connection for A/C refrigerant lines -A- fastened to the
accumulator.

-

Tighten bolt -B- for this version to 20 Nm (15 ft lb).

Air Door, HVAC > < Accumulator HVAC|Description and Operation|Page 4936