A8L V8-4.2L (BFM) (2004)
CAUTION: Always adhere to installation sequence for A-pillar trim.
-
Insert upper A-pillar trim - 1 - at front between rubber door seal and side panel.
-
Insert trim retainer - 3 - into corresponding clip.
-
Secure upper A-pillar trim - 1 - with two clips - 2 - (2x).
-
Screw in bolt - 4 -.
CAUTION: Make sure that trim is firmly seated.
-
Make sure rubber door seal is properly fitted over upper A-pillar trim.
2
-
Clips
-
Qty. 2
3
-
Retainer
4
-
Bolt
-
Tightening torque: 4 Nm
-
Self-locking
-
Replace
-
Tapped holes for bolts are always to be cleaned (e.g. with a thread cutter)