A8L V8-4.2L (BFM) (2004)
‹› Front wheel housing
Welding in
-
Prepare body flanges and new parts for welding.
-
Assemble new part using alignment bracket.
-
Suspension strut mounting/ subframe bracket to plenum chamber (from below), SG stepped seam
-
Suspension strut mounting to carrier, SG continuous seam.
-
Separating cut at plenum chamber: place additional metal behind joint, SG continuous seam
-
Weld remaining joint in, SG continuous seam.
-
Front longitudinal member to cast node, SG continuous seam.