Exploded view - turbocharger
- Make
- Audi
- Model
- Q3 8U
- Year
- 2011–2018
- Section
- Turbocharger › Exploded view - turbocharger
5-cylinder direct injection engine (2.5 ltr. 4-valve TFSI)Exploded view - turbocharger
Exploded view - turbocharger

- Coolant supply line
- Banjo bolt
37.5 Nm - Seals
Renew after removing - Not fitted
- Turbocharger
Combined with exhaust manifold
Removing and installing → Chapter - Lambda probe G39 with Lambda probe heater Z19
Removing and installing → Chapter - Nut
Tightening torque and sequence → Fig. - Bolt
9 Nm - Coolant return hose/pipe
- Seals
Renew after removing - Banjo bolt
37.5 Nm - Oil supply line
- Bolt
9 Nm - Seals
Renew after removing - Banjo bolt
37.5 Nm - Banjo bolt
37.5 Nm - Seals
Renew after removing - Gasket
Renew after removing - Mounting strip
Remains installed when turbocharger is removed - Nut
Renew after removing
First tighten centre nut on mounting strip
30 Nm - O-ring
Renew after removing - Gasket
Renew after removing - Oil return line
- Gasket
Renew after removing - Bolt
9 Nm - Bolt
9 Nm - Bolt
9 Nm

Note
- Renew nuts for turbocharger.
Tighten bolts in 4 stages in the sequence shown:
| Stage | Bolts | Tightening torque |
|---|---|---|
| 1. | (1 … 6) | 15 Nm |
| 2. | (1 … 6) | 33 Nm |
| 3. | (1 … 6) | 33 Nm 1) |
| 4. | (1 … 6) | 33 Nm 1) |
| 1) Performing this procedure guarantees all bolts remain tightened to 33 Nm after turbocharger gasket has settled. |

- Bolt
4 Nm - Charge pressure control solenoid valve N75
- Hose
- Bolt
9 Nm - Connection
For crankcase breather - Seal
Renew after removing
Clip onto air pipe - Turbocharger
Combined with exhaust manifold
Removing and installing → Chapter - Air pipe
- Bolt
9 Nm - Air hose
- Hose
- Bolt
9 Nm - Heat shield
- Air pipe
- Seals
Renew after removing - Banjo bolt
15.5 Nm - Hose
- Bolt
9 Nm - Gasket
Renew after removing
Clip onto connection - Hose

- O-ring
Renew after removing - Throttle valve module J338
Removing and installing → Chapter - Intake connecting pipe
- Bolt
9 Nm - Turbocharger air recirculation valve N249
Removing and installing → Chapter - Bolt
9 Nm - O-ring
Renew after removing - O-ring
Renew after removing - Charge pressure sender G31 / intake air temperature sender 2 G299
Removing and installing → Chapter - Bolt
9 Nm

- Bolt
9 Nm - Intake connecting pipe
- O-ring
Renew after removing - Throttle valve module J338
Removing and installing → Chapter - Bolt
9 Nm - Bracket
For engine cover panel - Grommet
- O-ring
Renew after removing - Bolt
9 Nm - Turbocharger air recirculation valve N249
Removing and installing → Chapter - Charge pressure sender G31 / intake air temperature sender 2 G299
Removing and installing → Chapter - Bolt
9 Nm - O-ring
Renew after removing
Parts & tools for this job For 2011 Audi Q3
- PARTEngine gasket setSearch: Audi Q3 2011 engine gasket set
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLFeeler gauge setSearch: feeler gauge set
As an Amazon Associate we earn from qualifying purchases.