Workshop Manuals Factory service & repair Audi
01 4-cylinder direct injection engine (1.8 ltr., 2.0 ltr. 4V TFSI, generation II)02 Fuel supply system, petrol engines03 4-cylinder direct injection engine (1.4 ltr. 4-valve TFSI EA 211)04 4-cylinder direct injection engine (1.8 ltr., 2.0 ltr. 4V TFSI, generation III)05 4-cylinder TDI engine (2.0 ltr. 4-valve common rail EA 189 - generation II)06 Fuel supply system, diesel engines07 5-cylinder direct injection engine (2.5 ltr. 4-valve TFSI)08 4-cylinder TDI engine, 2.0 ltr. 4-valve common rail (EA 288 Gen. I)09 Technical data for engines10 Rear final drive 0AY, 0BR, 0BS, 0CR11 Servicing 6-speed manual gearbox 02Q, 0BB, 0FB12 7-speed dual clutch gearbox 0BH (S tronic)13 6-speed manual gearbox 02Q, 0BB14 6-speed manual gearbox 0A615 6-speed dual clutch gearbox 02E16 Running gear: Specifications for testing the braking force (according to German legislation)17 Running gear: Trailer Operation Guide18 Running gear, axles, steering19 Brake system20 Running gear: Wheel/Tyre Guide21 Heating, air conditioning22 Electrical system23 Electrical: Communication24 General body repairs, exterior25 General body repairs, interior
Audi Q3 8U (2011-2018)09 · Technical data for engines
09 · Engine

Spark plugs: renewing

Make
Audi
Model
Q3 8U
Year
2011–2018
Section
Overview of engines › Spark plugs: renewing
Technical data for enginesSpark plugs: renewing

Spark plugs: renewing

4-cyl. petrol engine 1.4 ltr. TFSI Chapter

4-cyl. petrol engine 2.0 ltr. TFSI (version 1) → Chapter

4-cyl. petrol engine 2.0 ltr. TFSI (version 2) → Chapter

5-cyl. petrol engine 2.5 ltr. TFSI Chapter

4-cyl. petrol engine 1.4 ltr. TFSI

Special tools and workshop equipment requiredSpark plug socket and extension 3122B
W00-0060
Puller T10530
W00-11460
Torque wrench V.A.G 1331, measuring range 6 to 50 NmOr: torque wrench VAS 6483, measuring range 3 to 60 Nm

Table of tightening torques for installation:

Component/fastener[Nm]
Spark plugs30
Bolts securing ignition coil8

Removal steps:

Remove engine cover panel → Chapter.

Step 1 - removing spark plugs:

Loosen hose clips (1) and (2) and remove air pipe.

A24-11135

Push ignition coil connector (2) towards ignition coil, release retainer and detach connector from ignition coil.

A28-10106

Move connector (2) slightly to one side. Make sure that wiring is not kinked or damaged.

Unscrew bolts (1) for ignition coils.

Insert puller T10530 into hole (1) of ignition coil and turn knurled nut (2) clockwise until puller is secured in place.

N28-10134

Carefully pull ignition coil out upwards using puller T10530.

N28-10135

Repeat removal procedure with all other ignition coils.

Unscrew spark plugs using spark plug socket and extension VAS 3122B.

Step 2 - installing spark plugs:

Install new spark plugs using spark plug socket and extension VAS 3122B and tighten to specified torque (see table of tightening torques for installation Anchor).

Fit all ignition coils loosely into spark plug apertures and align with connectors of connector rail.

Push ignition coils evenly onto spark plugs by hand (do not attempt to knock in coils with any kind of tool).

Tighten bolts (1) for ignition coils to specified torque (see table of tightening torques for installation Anchor).

A28-10106

Plug in connector (2) on each ignition coil until it engages.

Continue installation in reverse sequence.

4-cyl. petrol engine 2.0 ltr. TFSI (version 1)

Special tools and workshop equipment requiredSpark plug socket and extension 3122B
W00-0060
Puller T40039
N01-10794
Torque wrench V.A.G 1331, measuring range 6 to 50 NmOr: torque wrench V.A.G 1331, measuring range 3 to 60 NmOr: torque wrench VAS 5820, measuring range 20 to 100 Nm

Table of tightening torques for installation:

Component/fastener[Nm]
Spark plugs30

Removal steps:

Remove engine cover panel → Chapter.

Step 1 - removing spark plugs:

Release connectors for ignition coils (arrows) and unplug all connectors from ignition coils at the same time.

N01-10791

Place connector rail slightly to one side. Make sure that wiring is not kinked or damaged.

Position puller T40039 on thick rib at top of ignition coils and detach all ignition coils from spark plugs one after the other in direction of (arrow).

N01-10790

Unscrew spark plugs from cylinder head using spark plug socket VAS 3122B.

N01-10792

Step 2 - installing spark plugs:

Install new spark plugs using spark plug socket and extension VAS 3122B and tighten to specified torque (table Anchor).

Fit all ignition coils loosely into spark plug apertures and align with connectors of connector rail.

Push ignition coils evenly onto spark plugs by hand (do not attempt to knock in coils with any kind of tool).

Align connector rail and plug all connectors onto ignition coils so that they engage (direction of (arrow)).

N01-10793

Continue installation in reverse sequence.

Note

  • There are additional spark plug versions for the 4-cylinder petrol engine 2.0 ltr. TFSI Chapter.

4-cyl. petrol engine 2.0 ltr. TFSI (version 2)

Special tools and workshop equipment requiredSpark plug socket and extension 3122B
W00-0060
Puller T10530
W00-11460
Torque wrench V.A.G 1331, measuring range 6 to 50 NmOr: torque wrench VAS 6583, measuring range 3 to 60 Nm

Table of tightening torques for installation:

Component/fastener[Nm]
Spark plugs30
Centre hex stud and nut for ignition coils10

Removal steps:

Remove engine cover panel → Chapter.

Step 1 - removing spark plugs:

Unscrew nuts (2) and move earth wires (1) clear.

A28-10148

Push ignition coil connector towards ignition coil, release retainer and detach connector from ignition coil in direction of (arrow).

Move connector (2) slightly to one side. Make sure that wiring is not kinked or damaged.

Unscrew centre hex studs (3) for ignition coils.

Insert puller T10530 into hole (1) of ignition coil and turn knurled nut (2) clockwise until puller is secured in place.

N28-10134

Carefully pull ignition coil out upwards using puller T10530.

N28-10135

Repeat removal procedure with all other ignition coils.

Unscrew spark plugs using spark plug socket and extension VAS 3122B.

Step 2 - installing spark plugs:

Install new spark plugs using spark plug socket and extension VAS 3122B and tighten to specified torque (see table of tightening torques for installation Anchor).

Fit all ignition coils loosely into spark plug apertures and align with connectors of connector rail.

Push ignition coils evenly onto spark plugs by hand (do not attempt to knock in coils with any kind of tool).

Tighten centre hex studs (3) for ignition coils to specified torque (see table of tightening torques for installation Anchor).

A28-10148

Install earth wires, tightening nuts (2) of earth wires to specified torque (see table of tightening torques for installation Anchor).

Plug in connector on each ignition coil until it engages.

Continue installation in reverse sequence.

Note

  • There are additional spark plug versions for the 4-cylinder petrol engine 2.0 ltr. TFSI Chapter.

5-cyl. petrol engine 2.5 ltr. TFSI

Special tools and workshop equipment requiredSpark plug socket and extension 3122B
W00-0060
Puller T40039
N01-10794
Torque wrench VAS 6583, measuring range 3 to 60 Nm

Table of tightening torques for installation:

Component/fastener[Nm]
Spark plugs30
Bolts securing ignition coil5

Step 1 - removing spark plugs:

Unplug electrical connector (6) for Hall sender 3 G300.

A24-10714

Unscrew bolts (arrows) for connector rail.

Release connectors for ignition coils (1), (2), (3), (4) and (5) and unplug all connectors from ignition coils at the same time.

Place connector rail slightly to one side. Make sure that wiring is not kinked or damaged.

Position puller T40039 on thick rib at top of ignition coils and detach all ignition coils from spark plugs one after the other in direction of (arrow).

N28-10011

Unscrew spark plugs from cylinder head using spark plug socket VAS 3122B.

Step 2 - installing spark plugs:

Install new spark plugs using spark plug socket and extension VAS 3122B and tighten to specified torque (table Anchor).

Fit all ignition coils loosely into spark plug apertures and align with connectors of connector rail.

Push ignition coils evenly onto spark plugs by hand (do not attempt to knock in coils with any kind of tool).

Align connector rail and push all connectors onto ignition coils so that they engage.

Plug in electrical connector for Hall sender 3 G300.

Install connector rail, screwing in securing bolts to specified torque (see table of tightening torques for installation Anchor).

Continue installation in reverse sequence.

Parts & tools for this job For 2011 Audi Q3

As an Amazon Associate we earn from qualifying purchases.