Exploded view - centre differential
- Make
- Audi
- Model
- Q7 Mk2
- Year
- 2015–2023
- Section
- Centre differential › Exploded view - centre differential
8-speed automatic gearbox 0D5Exploded view - centre differential
Exploded view - centre differential

- O-ring
Renew
Lubricate with gear oil - Screw plug
For inspection and filler hole
For gear oil in transfer box
Tightening torque Anchor - Centre differential housing
Removing and installing → Chapter - Rear splined shaft
Removing and installing Chapter“Renewing oil seal for rear splined shaft”
Renew oil seal when renewing rear splined shaft - Oil seal
For rear splined shaft
Renewing → Chapter - Dust ring
Cannot be removed without being damaged - Bolt
Renew
Tightening torque and sequence → Fig. - Ball bearing
For rear splined shaft
Renewing → Chapter - Circlip
For rear splined shaft - Circlip
For ball bearing for rear splined shaft - Ball bearing
For centre differential
Renewing → Chapter - Centre differential

Note
- Renew bolts which are tightened by turning through a specified angle.
Tighten bolts in 3 stages in the sequence shown:
| Stage | Bolts | Tightening torque/tightening angle |
|---|---|---|
| 1. | (1) and (6) | 3 Nm |
| 2. | (1 … 6) | 10 Nm |
| 3. | (1 … 6) | Turn 90° further |
Parts & tools for this job For 2015 Audi Q7
- PARTTransmission filter kitSearch: Audi Q7 2015 transmission filter kit
- FLUIDAutomatic transmission fluidSearch: Audi automatic transmission fluid
- TOOLFluid transfer pumpSearch: fluid transfer pump
As an Amazon Associate we earn from qualifying purchases.