Installing gearbox
- Make
- Audi
- Model
- Q7 Mk2
- Year
- 2015–2023
- Section
- Removing and installing gearbox › Installing gearbox
Installing gearbox
Special tools and workshop equipment requiredRing spanner insert, 16 mm V.A.G 1332/14

Note
- Renew bolts which are tightened by turning through a specified angle.
- After removal, renew self-locking nuts and bolts, as well as seals, oil seals, gaskets and O-rings.
- Secure all hose connections with the correct hose clips (as original equipment); refer to Electronic parts catalogue.
- Re-attach all cable ties at the same locations when re-installing.
Before fitting a replacement gearbox, always blow through the ATF cooler and ATF lines with compressed air (not more than 10 bar) Anchor.
Before installing, it is important to clean any residue from threads in cylinder block using a tap.
When fitting a replacement gearbox: attach gearbox support, gearbox mounting and tunnel cross member to new gearbox → Chapter.
Position gearbox on gearbox support T40173 and secure with tensioning strap (1) of engine and gearbox jack, as shown in illustration.

Warning Drive lugs on ATF pump can be damaged if torque converter is not fitted correctly.
- Checking position of torque converter → Chapter
The following preparations must be made before joining the engine and gearbox:

Clean contact surface (1) on timing chain cover (bottom) and end seal (2) with cleaning solution D 009 401 04.
Use universal adhesive D 001 200 M2 to bond end seal to timing chain cover (bottom); refer to instructions.
Note
- The installation position on a vehicle with 3.0 ltr. TDI engine is shown as an example.
Move starter into installation position.
Insert transportation lock T40170 into gearbox housing from below and clamp onto flange shaft (1).

Check that dowel sleeves (A) for centralising engine/gearbox are in the cylinder block; install any missing dowel sleeves.

Check whether aluminium bolts for engine/gearbox connection can be reused and mark bolts if necessary Anchor.
Note
- When joining engine and gearbox, ensure that end seal is seated correctly.

Note
- Renew seals for catalytic converters.
Position gearbox against engine, screw in bolts (4, 5) and tighten them to specified torque.
Detach engine support T10533/1.
Raise gearbox using engine and gearbox jack VAS 6931 and tighten bolts for tunnel cross member → Chapter.
Move engine and gearbox jack VAS 6931 aside and tighten remaining bolts.

Position gearbox against engine and at the same time screw in bolt (1) for starter.
Screw in bolts (2 … 11) onto stop by hand.
Tighten bolts (1 ... 11).
Remove tensioning strap T10038 and hook 10-222A/20.
Raise gearbox using engine and gearbox jack VAS 6931 and tighten bolts for tunnel cross member → Chapter.
Remove engine and gearbox jack VAS 6931 with gearbox support T40173 from beneath gearbox.

Remove transportation lock T40170.
Note
- The following step is necessary to ensure that the torque converter makes even and proper contact on the drive plate and does not cant.
Press torque converter (2) slightly against drive plate (3) in direction of (arrow) using a suitable lever (1).
Secure torque converter to drive plate as follows:

Turn torque converter until hole is visible next to notch (arrow) in recess in bottom of gearbox housing, as shown in illustration.
Note
- There is only one notch at the periphery; turn the torque converter accordingly.
Tighten bolt (arrow) for torque converter (1) accessible in this position Item.

Note
- Use ring spanner insert, 16 mm V.A.G 1332/14 to tighten bolts.

To tighten bolts for torque converter, counterhold crankshaft with adapter T40058 and angled ring spanner.
Note
- When you then turn the crankshaft, only turn crankshaft in direction of engine rotation (arrow).

Warning Irreparable damage can be caused if the camshaft drive chain slips.
- Only turn crankshaft in the direction of engine rotation (arrow).
To tighten bolts for torque converter, counterhold crankshaft with wrench 21 mm T40263 and adapter T40314.

Turn crankshaft 60° further each time and tighten remaining five bolts (arrow) for torque converter.
Tighten remaining engine/gearbox securing bolts.
Remaining installation steps are carried out in reverse sequence; note the following:
Install body brace Running gear, axles, steeringRep. gr.40Suspension strut, upper links; Exploded view - suspension strut, upper links.
Install manual release cable for parking lock → Chapter.
Install ATF cooler → Chapter.
Install drive shafts Running gear, axles, steeringRep. gr.40Drive shaft; Exploded view - drive shaft.
Install heat shields for drive shafts Running gear, axles, steeringRep. gr.40Drive shaft; Removing and installing heat shield for drive shaft.
Install catalytic converters Rep. gr.26Emission control system; Exploded view - emission control system.
Electrical connections and routing Current flow diagrams, Electrical fault finding and Fitting locations.
Secure intermediate steering shaft to steering rack Running gear, axles, steeringRep. gr.48Steering column; Removing and installing intermediate steering shaft.
Install front exhaust pipe and align exhaust system so it is free of stress Rep. gr.26Emission control system; Exploded view - emission control system.
Install front silencers and exhaust system (align so that it is free of stress) Rep. gr.26Exhaust pipes/silencers; Exploded view - silencers.
Install gearbox oil cooling valve N509Rep. gr.19Coolant pump/thermostat assembly; Exploded view - electric coolant pump.
Install coolant circulation pump V50Rep. gr.19Coolant pump/thermostat assembly; Exploded view - electric coolant pump.
Install coolant pipe on gearbox (right-side) Rep. gr.19Coolant pipes; Removing and installing coolant pipes.
Install subframe shield and subframe cross brace Running gear, axles, steeringRep. gr.40Subframe; Exploded view - subframe.
Install propshaft Rear final driveRep. gr.39Propshaft; Removing and installing propshaft.
Fill up with coolant Rep. gr.19Cooling system/coolant; Draining and filling cooling system.
Install air cleaner housing Rep. gr.23Air cleaner; Removing and installing air cleaner housing or Rep. gr.24Air cleaner; Removing and installing air cleaner housing.
Observe measures required after connecting battery Electrical systemRep. gr.27Battery; Disconnecting and connecting battery.
Warning Overvoltage can cause irreparable damage to control units.
- Do not use charger for boost starting.
Check manual release mechanism for parking lock → Chapter.
Check ATF level and top up as required → Chapter.
Parts & tools for this job For 2015 Audi Q7
- PARTTransmission filter kitSearch: Audi Q7 2015 transmission filter kit
- FLUIDAutomatic transmission fluidSearch: Audi automatic transmission fluid
- TOOLFluid transfer pumpSearch: fluid transfer pump
As an Amazon Associate we earn from qualifying purchases.