Exploded view - propshaft
- Make
- Audi
- Model
- Q7 Mk2
- Year
- 2015–2023
- Section
- Propshaft › Exploded view - propshaft
Rear final drive 0D2, 0D3, 0DBExploded view - propshaft
Exploded view - propshaft

- Gearbox
- Hose clip
Renew - Propshaft
Removing and installing → Chapter
Detaching and attaching propshaft at rear final drive → Chapter
Renewing protective boot → Chapter - Bolt
Self-locking
Always renew
Clean remaining locking fluid out of tapped holes in flange shaft on rear final drive. The threads can be cleaned with a thread tap
Tightening torque and sequence → Fig. - Lock plate
- Gasket
Renew gasket if damaged (buckled or kinked)
Renew gasket if rubber coating has become detached
Degrease flange shaft and fit gasket
Different coloured sides can be disregarded for installation - Rear final driveRemoving and installing → Chapter
- Centre bearing
Fit centring pin into hole on underbody, then secure - Bolt
20 Nm - Bolt
28 Nm - Heat shield
Not fitted on all versions

Tighten bolts (1) in 3 stages as follows:
| Stage | Bolts | Tightening torque/tightening angle |
|---|---|---|
| 1. | (1) | Bolt nearest to coloured dots: 30 Nm1) |
| 2. | (1) | All remaining bolts: 30 Nm |
| 3. | (1) | All bolts: turn 90° further |
| 1) This pushes the CV joint slightly towards the opposite side and reduces the imbalance. |
Parts & tools for this job For 2015 Audi Q7
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Audi Q7
As an Amazon Associate we earn from qualifying purchases.