Transmission layout
- Make
- Audi
- Model
- R8 Mk2
- Year
- 2015–2023
- Section
- Transmission layout › Transmission layout
Front final drive 0D4Transmission layout
Transmission layout

- Gearbox
Removing 7-speed dual clutch gearbox 0BZRep. gr.34Removing and installing gearbox; Removing gearbox
Installing 7-speed dual clutch gearbox 0BZRep. gr.34Removing and installing gearbox; Installing gearbox - Engine
Removing and installing 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve)Rep. gr.10Removing and installing engine - Propshaft
Exploded view → Chapter - Front final drive
Exploded view → Chapter - Haldex coupling
- Transmission shaft
Exploded view → Chapter
Runs directly through sump of engine and is not visible from outside
Parts & tools for this job For 2015 Audi R8
- TOOLTorque wrenchSearch: 3/8 inch torque wrench
- TOOLSocket setSearch: socket set metric
- BOOKHaynes manualSearch: Haynes manual Audi R8
As an Amazon Associate we earn from qualifying purchases.