audi Workshop Repair Guides

Audi Workshop Service and Repair Manuals

With Manufacturer's Scan Tool|Page 6129 > < With Manufacturer's Scan Tool|Page 6127
Page 6
background image

-

Harness connectors at ignition coils disconnected

-

Disconnect all harness connectors from all fuel injectors. 

NOTE:  Fuel must not be injected during the test to avoid damaging catalytic converter.Connectors must therefore be disconnected from fuel injectors.

-

Connect e.g. V.A.G 1527 B voltage tester to connector terminals 2 and 3.

-

Operate starter briefly. 
-

LED must blink (brief blink signal).

-

Switch ignition off.

If LED does not blink:

-

Connect test box to wiring harness of Engine Control Module (ECM); ECM is not connected. See: Computers and Control Systems/Testing and
Inspection/Reading and Clearing Diagnostic Trouble Codes/Scan Tool Connecting/With Generic Scan Tool/Test Box, Connecting For Wiring
Test

-

Check the following wire connections for open circuit according to wiring diagram: 

Harness connector

Test box

 

Terminal 3

Socket

Cyl. 1

102 

Cyl. 2

Cyl. 3

111 

Cyl. 4

94 

Cyl. 5

103 

Cyl. 6

110 

Cyl. 7

Cyl. 8

95 

-

Specified value: Wire resistance max 1.5 Ohm

-

Also check wires for short circuit to each other as well as to B+ and Ground (GND). 
-

Specified value: infinity Ohm (no continuity)

-

If necessary, repair wire connection. 

If no malfunctions are found in wires:

-

Replace the combined component, ignition coil with power output stage. 

Final procedures 
After repair work, the following work steps must be performed in the mentioned sequence:

With Manufacturer's Scan Tool|Page 6129 > < With Manufacturer's Scan Tool|Page 6127