bmw Workshop Repair Guides

BMW Workshop Manuals

< PREV PAGE NEXT PAGE >
Page 2
background image

Assemble cross member 00 0 200  with special tools 00 0 202 ,
00 0 204 , 00 0 208 .

Note:

Use towing hook (72 15 8 108 670).

Important!

Avoid a change of engine position in the transverse or
longitudinal direction.

Always make sure there is sufficient clearance between the
engine (or its attachment parts) and the body.

Important!

Risk of damage!

With the aid of an assistant and the supports (2), place cross
member 00 0 200  on the screw connections of the side
panels.

 

Screw in towing hook (1) and tighten down to approx. 30 Nm.

Secure special tool  11 0 000  to spindle  00 0 202 .

Fit suitable chains to special tool  11 0 000  and attach to towing
hook (1) or engine lifting eye.

RA  Securing engine in installation position (N52)

BMW AG - TIS

22.01.2013  03:18

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

2 Repair Instructions > 11 Engine (N52K) > 0 Engine, General > 4 RA Securing Engine In Installation Position (N52) > Page 241

< PREV PAGE NEXT PAGE >