5 Series E34 518g (M43) TOUR
Mark vacuum hoses (1 to 3), open hose clamps and pull off
hoses.
Remove coolant hose on high-pressure unit. Loosen hose clamp
and pull off coolant hose.
Installation:
Replace hose clamp and replace coolant hose if necessary.
Remove entire low pressure and metering unit with bracket.
Installation:
Perform leak and pressure test,
refer to 13 80 600
RA Additional work for CNG vehicle (remove and install low-pressure and metering un
BMW AG - TIS
15.01.2013 13:15
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -