5 Series E34 518g (M43) TOUR
13 80 700
Additional work for CNG vehicle (remove and
install low-pressure and metering unit
completely with retaining bracket)
Drain CNG system,
refer to section on draining the CNG system
Unfasten bolt (1) and remove ground wire on low-pressure unit.
Pull vacuum hose off low-pressure unit.
Disconnect plug connectors (1 to 3) on low-pressure unit.
Unfasten banjo bolts (1) of air intake lines on low-pressure unit.
Installation:
Replace sealing rings.
Tightening Torque,
refer to Technical Data 13 81 1AZ
RA Additional work for CNG vehicle (remove and install low-pressure and metering un
BMW AG - TIS
15.01.2013 13:15
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 1 -