5 Series E34 518g (M43) TOUR
Mark nut (1) and screw connection body (2) with paint. Brace
screw connection body (2) with open-end wrench and tighten
down nut (1) at 90
°
.
After assembly, perform a leak and pressure test,
refer to 13 80 600
If there are any leaks, retighten screw connection by no more than
45
°
.
If there is still a leak after this repeat leak and pressure test,
replace the pipe with clamping rings and the screw connection
body.
RA Opening/closing CNG-Swage-Lok connection
BMW AG - TIS
15.01.2013 13:13
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 2 -