bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 576 > < 6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 574
Page 8
background image

Installation:

Clean housing.

Drive out sealing cap (1 and 2) on rear housing section with a
mandrel from inside to outside.

Installation:

Replace sealing cap.

Replace bearing (1) and (2) (output shaft, countershaft and
retaining plates).

Lever out radial seal (3 and 4) for output and selector shafts.

Compress gear train at 5th/reverse gear sliding sleeve with
countershaft. Use special tool 23 2 250 .

Attach 3rd/4th gear shift arm with sliding blocks to 3rd/4th gear
slide sleeve.

Rest shift arm on 3rd gear wheel of output shaft. 

Connect shift arm with catch (1) in direction of drive shaft on left.

RA  Removing and installing complete drive and output shafts (S5D 260Z / 310Z / 320Z

BMW AG - TIS

23.01.2013  07:11

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 8 -

6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 576 > < 6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 574