bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 579 > < 6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 577
Page 11
background image

Remove special tool 23 2 250  from gear train.

Engage a gear.

Grip output flange with special tool 23 0 020 .

Tighten down screw (4).

Tightening torque, 23 11 10AZ.

Disengage selected gear again.

Install sealing cap (1) and drive in with special tool 23 2 150  until
flush.

Coat half shell (2) with sealing compound, refer to BMW Parts
Service, in area of screw bore and install.

Install pin (3), thrust washer (4), needle bearing (5) and reverse
gear wheel (6) with collar (7) pointing to housing.

Coat collar of screw head with sealing compound, refer to BMW
Parts Service.

Install screw (8) with screw retaining compound, refer to BMW
Parts Service, but do not tighten down.

Install 5th/reverse gear shift arm with sliding blocks with catch (1)
to left in 5th/reverse gear sliding sleeve.

RA  Removing and installing complete drive and output shafts (S5D 260Z / 310Z / 320Z

BMW AG - TIS

23.01.2013  07:11

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 11 -

6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 579 > < 6 RA Removing And Installing Complete Drive And Output Shafts (S5D 260Z _ 310Z _ 320Z|Page 577