bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 588 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)
Page 2
background image

Block output flange using special tool 23 0 020.

Unfasten collar nut with special tool 23 1 210.

Pull off output flange.

Note:

If ease-of-movement is impaired, remove output flange with
special tool 33 1 150.

Remove radial seal with special tool 00 5 010.

Remove cap (1).

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 2 -

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 588 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)