bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 589 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 587
Page 3
background image

Remove compression springs (1) and cylinder pins (2).

Remove locking stops and ball stops (3) (5 off) with help of a
magnet (4).

Note:

Note locking pin (1) in the central selector rod!

Locking pin (1) on middle selector rod (2) must locate in centre of
selector rod.

Note:

To secure the position of the locking pin (1), the transmission
must be shifted into 2nd gear.

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 3 -

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 589 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 587