bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 600 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 598
Page 14
background image

Lift radial seal on selector shaft out of rear case.

Heat inner bearing race (1) and rear case section in area around
bearing to 110 ... 120 

°

C (hot air blower).

The heating temperature must be precisely maintained.

Check with a thermometer.

Insert rear case section up to limit stop. Install 3 screws with new
sealing rings. Remove special tool 23 2 440.

Screw in fourth screw with new sealing ring.

Tighten down all screws.

Tightening torque,

refer to Technical Data 23 11 17AZ.

Lightly secure front and rear case sections with opposite two
screws.

Place rear case section on support 23 0 100 and again lift with
the assembly hoist 00 1 490.

Drive in cotter pin (1).

RA  Complete removal and installation of input and output shafts (S5D 200G/ 250G)

BMW AG - TIS

23.01.2013  07:12

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 14 -

7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 600 > < 7 RA Complete Removal And Installation Of Input And Output Shafts (S5D 200G_ 250G)|Page 598