bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 638 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 636
Page 11
background image

Heat inner bearing race (1) to approx. 80 

°

C (hot air blower) and

push onto layshaft until limit stop.

Insert 3 thrust pieces (1) with bevels outward and 3 (pressure)
springs (2) in guide sleeve opening.

Attach sliding sleeve (1) with the orientation groove (2) to the 3rd
gear wheel (3).

The three recessed teeth (4) must point towards the springs (5) /
sliding blocks.

Tilt thrust pieces (1) out of the operating sleeve separately far
enough that balls (3) can be placed on the springs. Push in balls
(3) and simultaneously press the thrust pieces into the operating
sleeve. Insert 3rd gear synchronizer ring into the sliding sleeve.
Pull the operating sleeve upwards uniformly as far as the lock
(neutral position).

RA  Detaching and mounting all synchronizing devices S5D 200G/250G

BMW AG - TIS

23.01.2013  07:13

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 11 -

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 638 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 636