bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 639 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 637
Page 12
background image

Connect needle bearing (1), synchronizer ring (2) and 4th gear
wheel (3) to the layshaft.

Note:

Coat needle bearing and synchronizer ring on bearing
surfaces with ATF-oil.

Slip stop disc (1) over the gearing up to the bearing surface.

Insert small radius supporting ring (two parts) (1) downwards into
the groove.

If the supporting ring is replaced, the end float must be adjusted.

Max. end float 0.04 mm.

Supporting rings from 2.9 ... 3.15 mm in increments of 0.05 mm
are available in Parts Service.

Attach special tool 23 2 410 to the layshaft.

Clip the closing ring (1) with 4 fastening lugs into the groove (3).

RA  Detaching and mounting all synchronizing devices S5D 200G/250G

BMW AG - TIS

23.01.2013  07:13

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 12 -

2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 639 > < 2 RA Detaching And Mounting All Synchronizing Devices S5D 200G_250G|Page 637