bmw Workshop Repair Guides

BMW Workshop Service and Repair Manuals

8 RA Replacing Timing Chain (M62 Up To 9_98)|Page 784 > < 8 RA Replacing Timing Chain (M62 Up To 9_98)|Page 782
Page 7
background image

Install guide rail.

Install all screws

Tighten screws (1)

Tighten screw (3)

Tighten down screw (2) for oil separator

Note:

There is a small bore in the throttle ring (1).

Check throttle ring (1), replace if necessary.

1. 

Insert throttle ring (1) in reversing rail

2. 

Replace O-ring (2) and insert in reversing rail

3. 

Replace O-ring (3)

Coat O-ring (3) with oil as lubricant.

Install reversing rail and insert screws (2 and 3).

Note:

Screws (2) with M6 thread.

Screws (3) with M7 thread.

Tightening Torque for screws (2 and 3),

refer to Technical Data 11 31 10AZ.

Replace grub screw (1).

Insert grub screw only until it makes contact with angle section (1)
without play, do not tighten down.

Note:

The grub screw (1) secures the angle bracket in the cylinder
head.

RA  Replacing timing chain (M62 up to 9/98)

BMW AG - TIS

20.02.2013  13:32

Issue status (12/2007) Valid only until next DVD is issued

Copyright

Page  - 7 -

8 RA Replacing Timing Chain (M62 Up To 9_98)|Page 784 > < 8 RA Replacing Timing Chain (M62 Up To 9_98)|Page 782