5 Series E39 540i (M62) TOUR
Insert remaining three screws on inlet camshaft on cylinder bank 5
to 8 without play.
Press bow cover against the timing chain. Secure bow cover with
a plastic strap (1).
Remove timing case cover, bottom,
refer to 11 14 110.
Install upper oil sump section,
refer to 11 13 010.
Secure crankshaft in TDC position with special tool 11 2 300.
RA Replacing timing chain (M62 up to 9/98)
BMW AG - TIS
20.02.2013 13:32
Issue status (12/2007) Valid only until next DVD is issued
Copyright
Page - 9 -